何凯彦, 李维波, 许智豪, 徐聪, 李巍. 基于双CPU的双以太网与双RS-422交互通信技术[J]. 中国舰船研究, 2020, 15(3): 177-184. DOI: 10.19693/j.issn.1673-3185.01516
引用本文: 何凯彦, 李维波, 许智豪, 徐聪, 李巍. 基于双CPU的双以太网与双RS-422交互通信技术[J]. 中国舰船研究, 2020, 15(3): 177-184. DOI: 10.19693/j.issn.1673-3185.01516
HE Kaiyan, LI Weibo, XU Zhihao, XU Cong, LI Wei. Dual Ethernet and dual RS-422 interactive communication technology based on dual CPU[J]. Chinese Journal of Ship Research, 2020, 15(3): 177-184. DOI: 10.19693/j.issn.1673-3185.01516
Citation: HE Kaiyan, LI Weibo, XU Zhihao, XU Cong, LI Wei. Dual Ethernet and dual RS-422 interactive communication technology based on dual CPU[J]. Chinese Journal of Ship Research, 2020, 15(3): 177-184. DOI: 10.19693/j.issn.1673-3185.01516

基于双CPU的双以太网与双RS-422交互通信技术

Dual Ethernet and dual RS-422 interactive communication technology based on dual CPU

  • 摘要:
      目的   随着舰船综合电力系统(Integrated Power System,IPS)电气化水平的不断提高,舰船实时获得设备信息和实现智能化控制是保证设备安全稳定运行、正确决策的前提。
      方法   搭建基于双CPU的双以太网与双RS-422交互通信系统,研究该系统的硬件和软件实现方法。
      结果   在发生故障时能够快速切换到备用网络,从而保证现场信息的实时传输,增强系统的抗干扰能力和通信可靠性。
      结论   该通信系统在舰船综合电力能量管理系统、分布式变电站、电力电子变换装置和工业现场监控系统等需要实时在线监测和数据传输的场合具备较高的使用价值。

     

    Abstract:
      Objectives   With the continuous improvement of the electrification level of the Integrated Power System(IPS), real-time acquisition of equipment information and intelligent control of ships are prerequisites for ensuring safe and stable operation of equipment and correct decision-making.
      Methods   In this paper, a dual-CPU-based dual Ethernet and dual RS-422 interactive communication system was built, and the hardware and software implementation of this interactive communication system was studied.
      Results   It can quickly switch to the standby network in the event of a fault, thereby ensuring real-time transmission of on-site information and enhancing the anti-jamming capability and communication reliability of the system.
      Conclusions   The communication system has high use value in the occasions where real-time online monitoring and data transmission are required, such as in the ship's integrated power energy management system, distributed substation, power conversion device and industrial field monitoring system.

     

/

返回文章
返回